The site requirements
Identify equipment locations, building paths and the systems that need wired or wireless connectivity.
Voice + data + connected building systems
Phones, access points, cameras and other connected systems rely on a physical path with suitable power and network connections. CTS Companies helps businesses plan cabling and connectivity around the site and the work the technology must support.
The business question
A new device may expose an old problem: an undocumented cable, an inconvenient equipment location or an installation planned after the workspace is finished. Bring the connectivity requirements into the project early so the physical work and the system design fit together.
Both projects may depend on the same network closets, cable routes and power capacity. Coordinating the physical plan can prevent separate installations from creating conflicting assumptions.
Define the service
The useful scope connects the technical capability with the people and operating work around it.
Identify equipment locations, building paths and the systems that need wired or wireless connectivity.
Coordinate cabling, switching, power and service connections with the intended applications and supported equipment.
Agree labeling, test results, documentation and the owner responsible for future changes.
From discussion to operation
Start with the current environment, define the responsibility and agree on how the work will be reviewed.
Map how people and systems will use the space, including moves, expansions and installation constraints.
Review pathways and dependencies, coordinate appropriate trades and establish the agreed installation requirements.
Verify the scoped connections and provide records that help the next technician understand what was installed.
Installation scope depends on site conditions, building approvals and applicable requirements. Specialized electrical, structural or life-safety work requires the appropriate qualified trades; it is not assumed to be included in a general connectivity project.
Questions before you decide
These distinctions help make the service conversation more useful.
Choose the medium and design based on the link requirements, equipment and site conditions. Review the specific cable project separately.
Wireless still needs a supported design and infrastructure. The appropriate mix depends on the application and environment.
Agree labeling, connection identification and the relevant scoped test documentation before installation begins.
Part of the wider environment
This service works alongside other parts of your IT and security operating model.
Start with your environment
Tell us what is changing, what concerns you and how the responsibility is handled today. We will help you identify a useful next step.